EUEEFF - Energy Efficiency Framework (Bulgaria, Romania) blue sky

EU/EBRD
Energy Efficiency Finance Facility - EUEEFF

EU

 

  October-2011                  
REUP Name  Industry Sector Category Bank Project Cost EUEEFF Submitted Energy Savings  Emissions Reduction Ratio Status
EU1 Orgachim Chemical Replacement of equipment UCB 316 611 314 427 04.02.2008 759 MWh/yr 0.755 Verified
EU2 KAI Khan Asparuh Ceramic Tiles Production Replacemnet of machines UCB 1 500 000 1 500 000 04.30.2008 14 167 MWh/yr 0.424 Verified
EU3 Sugar Plants Food Processing Fuel switching, new burners UBB 425 000 400 000 04.30.2008 5 896 MWh/yr 0.829 Verified
EU5 Sparky Eltos Jsc. Hand Tools Casting Machine Replacement UCB 2 511 260 2 500 000 06.30.2008 4 739 MWh/yr 0.532 Verified
EU6 Bulmarket Alternative Fuels Thermal insulation, heating system replacement UBB 1 009 260 807 408 07.07.2008 2 068 MWh/yr 0.861 Verified
EU7 Mashstroy Machine Tools Fuel switching, HFO/ NG UBB 395 413 316 322 07.08.2008 1 714 MWh/yr 0.628 Verified
EU8 Texicom Ltd. Textile Industry Thermal insulation of the external walls and roof; Reconstruction of the heating system switching from electricity to natural gas; Installation of a new gas heat pump. UCB 155 201 155 201 08.03.2008 225 MWh/yr 0.924 Verified
EU9 ZSK Stomanobeton Jsc. Steelconcrete constructions Transport, concrete center replacement UBB 1 086 783 1 086 783 08.08.2008 1 099 MWh/yr 0.907 Verified
EU10 Fazerles Hardboard production Technology improvements UBB 1 226 280 900 000 09.08.2008 2 593 MWh/yr 0.157 Verified
EU11 Npack Paper production Insulation, lighting retrofit, and switch from elec to gas heating UCB 110 529 87 000 10.22.2008 211 MWh/yr 0.890 CVR visit made
EU12 Riton - P Sewing Industry External insulation and framework replacement, Boiler replacement UCB 245 259 171 681 11.28.2008 1 101 MWh/yr 0.521 canceled
EU13 Moni83 Metal items manifactures Termal insulation, fuel switch UCB 178 850 143 080 12.30.2008 813 MWh/yr 0.676 canceled
EU14 KAI Khan Omurtag Ceramic Tiles Production Replacement of machines UCB 1 766 535 1 500 000 01.28.2009 11 913 MWh/yr 0.403 Verified
EU15 KMM Shumen Ship equipment manifacturing Gasification, Fuel Switch UCB 194 826 175 343 04.22.2009 476 MWh/yr 0.462 canceled
EU16 Vinprom Peshtera Chemical factory Co-generation UCB 3 869 497 2 400 000 05.26.2009 15 068 MWh/yr 0.279 canceled
EU17 Orgachim Chemical Replacement of equipment UCB 1 016 290 833 000 06.23.2009 1 622 MWh/yr 0.565 Verified
EU18 Bul Plant Greenhouse Triple generation UBB 958 383 670 868 07.22.2009 1 349 MWh/yr 0.612 Verified
EU21 Espansione Shoes industry Thermal  insulation of walls, roof and floor and replacement of windows framework with PVC. UCB 127 646 164 523 25.02.2010 760 MWh/yr 0.000 Verified
EU22 Lemi Trafo Manufacture of transformers Replacement of furnace & production equipment UCB 746 401 746 401 26.03.2010 352 MWh/yr 0.352 Verified
EU23 Hlebni izdelia-Poduyane Jsc Bread industry Replacement of 3 old rotary furnaces with 1 floor-flow furnace and 5 old floor-flow furnaces with 1 tunnel furnace with continuous action UCB 567 073 734 250 30.04.2010 2 922 MWh/yr 0.419 Verified
EU24 Stratos Ltd Bread industry Replacement of old production equipment with new one UCB 153 600 192 358 31.05.2010 561 MWh/yr 0.353 Verified
EU25 Interpred Partner Ltd Production of kitchen towels, facial tissues, toilet paper, serviettes Production of kitchen towels, facial tissues, toilet paper, serviettes UCB 747 000 747 000 23.07.2010;28.02.2011-revised 96 MWh/yr 0.437 Loan
EU26 Agro KP Ltd  Agriculture Replacement of old agricultural production machinery with new one UCB 640 000 710 000 16.08.2010 1 698 MWh/yr 0.000 Verified
EU27 Neochim Plc Chemical industry Rehabilitation and modernization of steam turbine P-2.3-35/17-1 UCB 220 000 314 141 08.09.2010 2 685 MWh/yr 0.701 Waiting for CVR visit
EU28 Mio Ltd Bread industry Replacement of old production equipment with new one UCB 284 754 355 943 14.10.2010 984 MWh/yr 0.521 Verified
EU29 Ognyanovo K Extraction and production of lime and building materials Replacement of 4 old kilns with new larger and efficient kiln UCB 2 500 000 3 268 000 29.10.2010 27 867 MWh/yr 0.097 Loan
EU30 Zlatia Agro Ltd Agriculture Replacement of old agricultural production machinery with new one UCB 520 000 545 500 23.11.2010 966 MWh/yr 0.466 Verified
EU31 EMKA Jsc Production of cables and cord Replacement of machine for enamelling on copper wires and other ESMs
 
UBB 400 000 517 876 01.12.2010 1 600 MWh/yr 0.434 Loan
EU32 Assarel Medet Jsc Mining industry Replacement of production equipment UCB 987 308 1 060 908 29.04.2011 2 198 MWh/yr 0.000 Loan
EU33 OPPK Pobeda 93 Agriculture Replacement of old agricultural production machinery with new one UCB 198 000 207 794 29.06.2011 97 MWh/yr 0.000 Loan
25 057 759 23 525 807   108 597 MWh/yr