October-2011 |
|
|
|
|
|
|
|
|
|
| REUP |
Name |
Industry Sector |
Category |
Bank |
Project Cost |
EUEEFF |
Submitted |
Energy Savings |
Emissions Reduction Ratio |
Status |
| EU1 |
Orgachim |
Chemical |
Replacement of equipment |
UCB |
316 611 |
314 427 |
04.02.2008 |
759 MWh/yr |
0.755 |
Verified |
| EU2 |
KAI Khan Asparuh |
Ceramic Tiles Production |
Replacemnet of machines |
UCB |
1 500 000 |
1 500 000 |
04.30.2008 |
14 167 MWh/yr |
0.424 |
Verified |
| EU3 |
Sugar Plants |
Food Processing |
Fuel switching, new burners |
UBB |
425 000 |
400 000 |
04.30.2008 |
5 896 MWh/yr |
0.829 |
Verified |
| EU5 |
Sparky Eltos Jsc. |
Hand Tools |
Casting Machine Replacement |
UCB |
2 511 260 |
2 500 000 |
06.30.2008 |
4 739 MWh/yr |
0.532 |
Verified |
| EU6 |
Bulmarket |
Alternative Fuels |
Thermal insulation, heating system replacement |
UBB |
1 009 260 |
807 408 |
07.07.2008 |
2 068 MWh/yr |
0.861 |
Verified |
| EU7 |
Mashstroy |
Machine Tools |
Fuel switching, HFO/ NG |
UBB |
395 413 |
316 322 |
07.08.2008 |
1 714 MWh/yr |
0.628 |
Verified |
| EU8 |
Texicom Ltd. |
Textile Industry |
Thermal insulation of the external walls and roof; Reconstruction of the heating system switching from electricity to natural gas;
Installation of a new gas heat pump. |
UCB |
155 201 |
155 201 |
08.03.2008 |
225 MWh/yr |
0.924 |
Verified |
| EU9 |
ZSK Stomanobeton Jsc. |
Steelconcrete constructions |
Transport, concrete center replacement |
UBB |
1 086 783 |
1 086 783 |
08.08.2008 |
1 099 MWh/yr |
0.907 |
Verified |
| EU10 |
Fazerles |
Hardboard production |
Technology improvements |
UBB |
1 226 280 |
900 000 |
09.08.2008 |
2 593 MWh/yr |
0.157 |
Verified |
| EU11 |
Npack |
Paper production |
Insulation, lighting retrofit, and switch from elec to gas heating |
UCB |
110 529 |
87 000 |
10.22.2008 |
211 MWh/yr |
0.890 |
CVR visit made |
| EU12 |
Riton - P |
Sewing Industry |
External insulation and framework replacement, Boiler replacement |
UCB |
245 259 |
171 681 |
11.28.2008 |
1 101 MWh/yr |
0.521 |
canceled |
| EU13 |
Moni83 |
Metal items manifactures |
Termal insulation, fuel switch |
UCB |
178 850 |
143 080 |
12.30.2008 |
813 MWh/yr |
0.676 |
canceled |
| EU14 |
KAI Khan Omurtag |
Ceramic Tiles Production |
Replacement of machines |
UCB |
1 766 535 |
1 500 000 |
01.28.2009 |
11 913 MWh/yr |
0.403 |
Verified |
| EU15 |
KMM Shumen |
Ship equipment manifacturing |
Gasification, Fuel Switch |
UCB |
194 826 |
175 343 |
04.22.2009 |
476 MWh/yr |
0.462 |
canceled |
| EU16 |
Vinprom Peshtera |
Chemical factory |
Co-generation |
UCB |
3 869 497 |
2 400 000 |
05.26.2009 |
15 068 MWh/yr |
0.279 |
canceled |
| EU17 |
Orgachim |
Chemical |
Replacement of equipment |
UCB |
1 016 290 |
833 000 |
06.23.2009 |
1 622 MWh/yr |
0.565 |
Verified |
| EU18 |
Bul Plant |
Greenhouse |
Triple generation |
UBB |
958 383 |
670 868 |
07.22.2009 |
1 349 MWh/yr |
0.612 |
Verified |
| EU21 |
Espansione |
Shoes industry |
Thermal insulation of walls, roof and floor and replacement of windows framework with PVC. |
UCB |
127 646 |
164 523 |
25.02.2010 |
760 MWh/yr |
0.000 |
Verified |
| EU22 |
Lemi Trafo |
Manufacture of transformers |
Replacement of furnace & production equipment |
UCB |
746 401 |
746 401 |
26.03.2010 |
352 MWh/yr |
0.352 |
Verified |
| EU23 |
Hlebni izdelia-Poduyane Jsc |
Bread industry |
Replacement of 3 old rotary furnaces with 1 floor-flow furnace and 5
old floor-flow furnaces with 1 tunnel furnace with continuous action |
UCB |
567 073 |
734 250 |
30.04.2010 |
2 922 MWh/yr |
0.419 |
Verified |
| EU24 |
Stratos Ltd |
Bread industry |
Replacement of old production equipment with new one |
UCB |
153 600 |
192 358 |
31.05.2010 |
561 MWh/yr |
0.353 |
Verified |
| EU25 |
Interpred Partner Ltd |
Production of kitchen towels, facial tissues, toilet paper,
serviettes |
Production of kitchen towels, facial tissues, toilet paper,
serviettes |
UCB |
747 000 |
747 000 |
23.07.2010;28.02.2011-revised |
96 MWh/yr |
0.437 |
Loan |
| EU26 |
Agro KP Ltd |
Agriculture |
Replacement of old agricultural production machinery with new one |
UCB |
640 000 |
710 000 |
16.08.2010 |
1 698 MWh/yr |
0.000 |
Verified |
| EU27 |
Neochim Plc |
Chemical industry |
Rehabilitation and modernization of steam turbine P-2.3-35/17-1 |
UCB |
220 000 |
314 141 |
08.09.2010 |
2 685 MWh/yr |
0.701 |
Waiting for CVR visit |
| EU28 |
Mio Ltd |
Bread industry |
Replacement of old production equipment with new one |
UCB |
284 754 |
355 943 |
14.10.2010 |
984 MWh/yr |
0.521 |
Verified |
| EU29 |
Ognyanovo K |
Extraction and production of lime and building materials |
Replacement of 4 old kilns with new larger and efficient kiln |
UCB |
2 500 000 |
3 268 000 |
29.10.2010 |
27 867 MWh/yr |
0.097 |
Loan |
| EU30 |
Zlatia Agro Ltd |
Agriculture |
Replacement of old agricultural production machinery with new one |
UCB |
520 000 |
545 500 |
23.11.2010 |
966 MWh/yr |
0.466 |
Verified |
| EU31 |
EMKA Jsc |
Production of cables and cord |
Replacement of machine for enamelling on copper wires and other ESMs
|
UBB |
400 000 |
517 876 |
01.12.2010 |
1 600 MWh/yr |
0.434 |
Loan |
| EU32 |
Assarel Medet Jsc |
Mining industry |
Replacement of production equipment |
UCB |
987 308 |
1 060 908 |
29.04.2011 |
2 198 MWh/yr |
0.000 |
Loan |
| EU33 |
OPPK Pobeda 93 |
Agriculture |
Replacement of old agricultural production machinery with new one |
UCB |
198 000 |
207 794 |
29.06.2011 |
97 MWh/yr |
0.000 |
Loan |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
25 057 759 |
23 525 807 |
|